Home > Property > Your home > Building on a hill in Penang: slope classes, engineer checks and who watches the site
Building on a hill in Penang: slope classes, engineer checks and who watches the site
Hill sites in Penang are sorted into four classes by slope, and Classes 2 to 4 need a geotechnical report approved by the state's Committee for Development on Land With Risk. For Classes 3 and 4 an independent engineer must also inspect the site while work is under way and report breaches to the council.
The short version
- The rulebook is the Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, which the City Council of Penang Island (MBPP) publishes on its website.
- Slope decides the class. The steeper the land, the higher the class and the more checking.
- Classes 2, 3 and 4 need a geotechnical report approved by the state's Committee for Development on Land With Risk (CDLR).
- Classes 3 and 4 get an independent checker who inspects the site regularly and reports to the council.
- To raise a concern about work near you, see Complaints to MBPP and MBSP. For a landslip or other emergency, see Who to call in Penang.
What the guideline is
The guideline is a revised version of a 2012 guideline. It was reviewed by the Penang Technical Advisory Committee appointed by the state government. It says its main intention is to prevent hill slope failures and improve site safety, and that policies and conditions set by the state government and the local authority take precedence over it. Its notice says the implementing agencies, developers, engineers, contractors, property owners and all relevant parties are to abide by it.
Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.
How a hill is classed
The guideline first sorts the slope of the land into four hill slope classes:
| Hill slope class | Gradient |
|---|---|
| 1 | 0 to 15 degrees |
| 2 | Over 15 to 25 degrees |
| 3 | Over 25 to 35 degrees |
| 4 | Over 35 degrees |
A site is then given a hill site class from 1 to 4, from the average hill slope class score across the site. Man-made slopes and retaining walls on the site are also rated, and the site class is the highest of the results.
Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.
What each class needs
| Hill site class | Reports and engineers |
|---|---|
| 1 | Slope stability analysis by a civil engineer. No geotechnical report and no geotechnical engineer (GE). |
| 2 | Geotechnical report by a GE, checked by an independent checker (IC) and sent to CDLR for approval. |
| 3 and 4 | Geotechnical report by a GE and a review report by an IC, both sent to CDLR for approval. |
The GE and the IC on one project must be different engineers, and not from the same firm. For Classes 3 and 4 the IC needs the local authority's prior consent, and the council may appoint the IC at the developer's cost.
Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.
While work is under way
- Regular inspections: for Classes 3 and 4, an IC inspects the site regularly to audit compliance with building laws and the design report.
- Monthly reports: for Classes 3 and 4, the GE sends monthly geotechnical inspection reports and the IC sends monthly inspection reports.
- Reporting breaches: the GE and the IC are to notify MBPP or the Seberang Perai City Council (MBSP) of major contraventions of building laws or likely danger to site personnel and adjacent ground.
- Spot checks: representatives of any government agency may make random site visits to check the approved design and site supervision.
Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.
Design limits worth knowing
- Retaining walls: retaining structures are not recommended to exceed 4.5 m in height. The local authority may decide the height of a taller one.
- Next to a potentially unstable slope: if it cannot be adequately protected or strengthened, the development needs a buffer zone at least as wide as the slope is high.
- Unstable hill sites: development on an unstable hill site that cannot be strengthened because of access or land issues shall not be allowed.
Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.
After the building is finished
A GE prepares a Slope Maintenance Manual for every hill site development. The guideline says it is to be ready for handing over to the owner or the management body of the land or property before the Certificate of Completion and Compliance (CCC) is issued.
Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.
Related