Home > Property > Your home > Building on a hill in Penang: slope classes, engineer checks and who watches the site

Back to Your home

Building on a hill in Penang: slope classes, engineer checks and who watches the site

Hill sites in Penang are sorted into four classes by slope, and Classes 2 to 4 need a geotechnical report approved by the state's Committee for Development on Land With Risk. For Classes 3 and 4 an independent engineer must also inspect the site while work is under way and report breaches to the council.

The short version

What the guideline is

The guideline is a revised version of a 2012 guideline. It was reviewed by the Penang Technical Advisory Committee appointed by the state government. It says its main intention is to prevent hill slope failures and improve site safety, and that policies and conditions set by the state government and the local authority take precedence over it. Its notice says the implementing agencies, developers, engineers, contractors, property owners and all relevant parties are to abide by it.

Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.

How a hill is classed

The guideline first sorts the slope of the land into four hill slope classes:

Hill slope classGradient
10 to 15 degrees
2Over 15 to 25 degrees
3Over 25 to 35 degrees
4Over 35 degrees

A site is then given a hill site class from 1 to 4, from the average hill slope class score across the site. Man-made slopes and retaining walls on the site are also rated, and the site class is the highest of the results.

Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.

What each class needs

Hill site classReports and engineers
1Slope stability analysis by a civil engineer. No geotechnical report and no geotechnical engineer (GE).
2Geotechnical report by a GE, checked by an independent checker (IC) and sent to CDLR for approval.
3 and 4Geotechnical report by a GE and a review report by an IC, both sent to CDLR for approval.

The GE and the IC on one project must be different engineers, and not from the same firm. For Classes 3 and 4 the IC needs the local authority's prior consent, and the council may appoint the IC at the developer's cost.

Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.

While work is under way

Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.

Design limits worth knowing

Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.

After the building is finished

A GE prepares a Slope Maintenance Manual for every hill site development. The guideline says it is to be ready for handing over to the owner or the management body of the land or property before the Certificate of Completion and Compliance (CCC) is issued.

Source: Penang Safety Guideline for Hill Site Development, 2nd Edition 2020, read 2026-11-05.