Google
main bulk of costs went to ...
Re: Hawker Centre -- HP Post Reply   Forum
Posted by: kayes ®
07/31/2006, 09:08:23


a proper drainage system and the entire area was re-tarred and then re-floored. Many new water pipes and wash basins were added. Also the lighting was improved. Toilets were renovated. RM1 million does not go a long way :-) Best wishes, kayes.



Post Reply | |     |   | current page