| main bulk of costs went to ... | |||
| Re: Hawker Centre -- HP | Post Reply | Forum | |
|
Posted by: kayes ® 07/31/2006, 09:08:23 |
a proper drainage system and the entire area was re-tarred and then re-floored. Many new water pipes and wash basins were added. Also the lighting was improved. Toilets were renovated. RM1 million does not go a long way :-) Best wishes, kayes. |
| Post Reply | | | | | current page |